Self-consumption permitting
Single-line diagram of a self-consumption solar PV system: example and template
What the single-line diagram (SLD) of a self-consumption solar PV system has to show for the technical design report in Spain, with three downloadable examples (home, industrial building and microinverters) and a free generator that sizes cables and protection devices and gives you the editable SVG.
In short
The single-line diagram represents the installation with a single line, from the panel strings to the inverter, the protection devices, the meter and the grid, and in Spain it is mandatory in the technical design report and in the engineering project (ITC-BT-04 and ITC-BT-40 of the low-voltage regulations). It has to show every cable run with its cable, cross-section and length and every protection device with its rating. You can generate the one for your installation for free, with cables and protection devices sized and as an editable SVG, at https://www.suntropy.ai/en/blog/solar-pv-single-line-diagram/#generador.
- The single-line diagram (SLD) represents the installation with a single line: from the panel strings to the inverter, the protection devices, the distribution board, the meter and the grid. In Spain it is mandatory in the memoria técnica de diseño (technical design report) and in the proyecto (engineering project) under the low-voltage regulations (REBT, ITC-BT-04 and ITC-BT-40).
- It has to show the origin and point of connection, every cable run with its cable, cross-section and length, every protection device with its rating, curve, breaking capacity and poles, the bidirectional meter, the export limiter if there is no surplus export, and the earthing.
- It changes depending on the case: zero export adds the zero-export relay with its current transformer at the supply origin; with batteries, the battery and its isolation; with microinverters, no DC combiner box.
- You can generate the one for your installation right here, with cables and protection devices sized, and there are three downloadable examples (5 kW single-phase home, 8 kW three-phase industrial building and a home with 5 microinverters) as editable SVG and as A4 PNG at 300 dpi.
The regulations cited in this article are Spanish (the REBT low-voltage regulations and their ITC-BT technical instructions). If you work in another country, check your local regulations and grid connection rules.
The single-line diagram (SLD) is the drawing that represents the electrical installation with a single line per circuit, even though each circuit carries several conductors. In a self-consumption PV system it traces the path of the energy: from the panel strings to the inverter, from there to the protection devices and the distribution board, and from the board to the meter and the grid.
It is not optional: the Spanish Low Voltage Electrotechnical Regulations (REBT, Reglamento Electrotécnico para Baja Tensión), in ITC-BT-04, require a single-line diagram in the memoria técnica de diseño (technical design report, up to 10 kW) and in the proyecto (engineering project, above 10 kW), and ITC-BT-40 sets which protection devices a generating installation must have. It also has to match the calculations in the report and the installation certificate.
The generator below has its interface in Spanish and sizes everything according to the Spanish REBT.
Single-line diagram of a home: 5 kW single-phase example with surplus export

Twelve 445 Wp modules in two strings of six, one per MPPT, into a 5 kW single-phase inverter with integrated DC isolator. At the output, the PV AC board (32 A circuit breaker, 40 A / 30 mA type A RCD and surge protection device), which connects to the main distribution board of the home, downstream of the main switch (IGA), and from there to the bidirectional meter.
Download: Editable SVG · A4 PNG at 300 dpi
Example: 8 kW three-phase industrial building with surplus export

Twenty 450 Wp modules in two strings of ten into an 8 kW three-phase inverter with integrated DC isolator and DC surge protection. The PV board sits in the inverter enclosure and a 20 m three-phase line takes it to the main distribution board of the building.
Download: Editable SVG · A4 PNG at 300 dpi
Example: home with microinverters (20 panels and 5 microinverters)

Twenty 455 Wp panels with five four-input microinverters (1.8 kW each), one panel per MPPT, split into two AC circuits: three microinverters and 12 panels on C1, two microinverters and 8 panels on C2. Each circuit has its own circuit breaker (32 A and 25 A), its 40 A / 30 mA type A RCD and its surge protection device, and both join in the PV board before reaching the home's main distribution board (CGMP) and the bidirectional meter.
With microinverters you have to draw every microinverter and every panel, with the MPPT each one goes into (P1…P20): if they are grouped with a «×3», whoever reviews the drawing counts 8 panels where there are 20. That is how an installer asked Alexandria for it: a single drawing with both circuits, final ratings, the CGMP marked, their company logo in the title block and which panel goes to each input, in five messages.
Download: Editable SVG · A4 PNG at 300 dpi
The SVGs open and can be edited in Inkscape, Illustrator or any CAD program that imports SVG. They are examples with fictitious data: the ratings and cross-sections of your installation come from its own calculation.
What the single-line diagram has to show
- Origin and point of connection: the distribution network, the bidirectional meter, the power control switch (ICP) if there is one, the main switch (IGA) and the main (or sub-) distribution board where the PV system connects.
- Supply data: voltage, number of phases, frequency, earthing system (TT on the public grid) and generator power.
- Generation: each string with the number and model of modules and the MPPT it goes to, the DC combiner box if there is one, the inverter (model, power, phases, MPPTs) and the batteries, microinverters or optimisers.
- Circuits: every cable run identified (L1, L2…) with cable type, conductors × cross-section + protective conductor, containment and length.
- Protection devices: gPV fuses, DC isolator and DC surge protection, circuit breaker, RCD, AC surge protection and main switch, each with its current, curve, breaking capacity, sensitivity and poles. And the accessible manual main disconnect switch for the grid operator, identified.
- Self-consumption: bidirectional meter at the boundary point, net generation meter if it is collective self-consumption, and the export limiter measuring at the supply origin if it is zero export.
- Earthing: the protective conductor and its connection to the existing earth.
- Title block and legend: company, project, engineer, location, date, scale, drawing number and the symbols used.
The reference topology
From left to right, the chain of a low-voltage self-consumption installation is always the same:
strings → DC combiner box (gPV fuses · isolator · surge protection) → inverter → PV AC board (circuit breaker · RCD · surge protection · earth) → export limiter, if zero export → existing main board (IGA · ICP) → bidirectional meter → grid
The DC combiner box is only needed if the inverter does not integrate the isolator and the surge protection, or if three or more strings go to the same MPPT (in which case, with gPV fuses).
How it changes depending on the case
| Case | What changes in the diagram |
|---|---|
| With surplus export (net billing or sale) | No export limiter. Bidirectional meter at the boundary point |
| Zero export | Zero-export relay with its current transformer at the supply origin, upstream of all loads, and its action on the inverter |
| With batteries | The battery hanging off the hybrid inverter (or a separate inverter-charger with its own AC line), with isolation and fuse on the DC side |
| Microinverters | No DC combiner box: each module goes to an input (MPPT) of its microinverter, and each microinverter is drawn individually. The microinverters on a circuit share an AC bus, with a circuit breaker, RCD and surge protection per circuit (example) |
| Optimisers | Like a string inverter, with the optimiser noted on the string label |
| Several inverters | One row per inverter with its protection devices and a common AC bus in the PV board |
| Collective self-consumption | Net generation meter at the output of the PV board. Consumers are not drawn: they are listed |
Symbols and labels
Symbols follow IEC 60617. What makes a single-line diagram readable are the labels, always in the same format:
| Element | Example label |
|---|---|
| String | S1 · 10 × 450 Wp · MPPT 1 |
| gPV fuse | 15 A gPV · 1000 V |
| Circuit breaker | 16 A · C · 4P · 10 kA (current · curve · poles · breaking capacity) |
| RCD | 25 A / 30 mA · tipo A · 4P (type A) |
| Surge protection device | tipo 2 · 1000 V (DC) or tipo 2 · Uc 275 V · In 20 kA (AC) |
| Inverter | INV1 · modelo · 8 kW · 3F · 2 MPPT |
| Cable run | L2 · RZ1-K 0,6/1 kV · 4X6+6 mm² · 12 m |
The labels are shown as they appear on a Spanish drawing. Cable runs use the Spanish notation live conductors × cross-section + protective conductor: 4X6+6 mm² is three-phase with neutral and protective conductor; 2X10+10 mm², single-phase; 2X6 mm², DC without protective conductor.
The most common mistakes
- Not matching the technical report: cross-sections, ratings or number of modules that differ from those in the calculation or the certificate.
- Cable runs without length or cross-section, or with the voltage drop unchecked (maximum 1.5 % cumulative on DC and on AC).
- Protection devices without breaking capacity, or with a breaking capacity lower than the short-circuit current at their location.
- The export limiter downstream of some load: it has to measure at the supply origin.
- Forgetting the main switch accessible to the grid operator, or the earthing.
- Drawing it by hand in a generic program, with symbols and text overlapping: the engineer will have to redo it.
Checklist before attaching it
- Voltage, phases, frequency and earthing system in the header.
- Every cable run with cable, conductors × cross-section, containment and length.
- Every protection device with current, curve, breaking capacity and poles; the RCD with sensitivity and type.
- DC isolator and DC surge protection (standalone or integrated, and stated); fuses if there are three or more strings per MPPT; AC surge protection.
- Export limiter at the supply origin if zero export; bidirectional meter; generation meter if collective.
- Earthing; batteries with their isolation if there are any.
- Complete title block, legend and drawing number consistent with the technical report.
The single-line diagram is one piece of the permitting file. For the rest, see how to fill in the technical report and the official forms with AI.
Frequently asked questions
What is the single-line diagram of a solar PV system?
It is the drawing that represents the installation with a single line per circuit: the panel strings, the inverter, the protection devices, the distribution board, the meter and the grid, with the cable, cross-section and length of every run and the rating of every protection device.
Is the single-line diagram mandatory to legalise a solar panel installation?
In Spain, yes. The technical design report (up to 10 kW) and the engineering project (above 10 kW) have to include the single-line diagram, according to ITC-BT-04 of the Low Voltage Regulations. In several Spanish regions (comunidades autónomas) the official report form has a page reserved for it. Which documents go with the single-line diagram in each case is covered in the general guide to permitting self-consumption (in Spanish).
Who has to draw the single-line diagram?
Whoever signs the technical documentation: the installation company in the technical design report, or the qualified engineer in the engineering project. It has to match their calculations and the installation certificate.
What changes in the single-line diagram of a zero-export installation?
You have to draw the export-limiting system: the zero-export relay with its current transformer at the supply origin, upstream of all loads, and its action on the inverter.
How do you draw the single-line diagram of an installation with microinverters?
Without a DC combiner box: each panel goes to an input (MPPT) of its microinverter and each microinverter is drawn with its panels, without grouping. The microinverters are split into AC circuits according to their current, and each circuit has its own circuit breaker, RCD and surge protection up to the main board. There is a downloadable example with 20 panels and 5 microinverters on this page.
What software do you use to draw a solar PV single-line diagram?
Any CAD or vector drawing program. The examples on this page are SVG, which you can edit with Inkscape or Illustrator or import into CAD. Alexandria, Suntropy's assistant, generates it directly from the study.
What cable cross-section goes on the single-line diagram?
The one that comes out of the calculation of each run: current-carrying capacity with its correction factors and voltage drop, so that the cumulative drop does not exceed 1.5 % on DC or on AC. In the examples, 6 mm² on DC and AC for short runs.
Sources
- Spanish Low Voltage Electrotechnical Regulations (REBT), Royal Decree 842/2002 (BOE): ITC-BT-04 (documentation) and ITC-BT-40 (generating installations)
- Royal Decree 1699/2011, on grid connection of small-scale generation installations (Spain)
- IEC 60617, graphical symbols for diagrams
Latest from the blog
- Sungrow error codes: 010, 039, 106, 038 and the rest, what they mean and what to check
- «Inefficient Power Plants» in SolisCloud: how to tell if the warning is real (two real plants)
- UN-G-V01 on a Solis inverter: what it means and how to diagnose it (real case)
- Solis grid alarms: OV-G-V01 (1010), OV-G-F01 (1012) and NO-Grid (1015), what they mean and a real case
- Solar PV System Maintenance